Report a problem
Judy's Book takes violations of our Terms of Use very seriously. We encourage
you to read through our
Terms of Use
before filling report with us.
After careful review, we may remove content or replace a content warning page before
viewing content deemed offensive, harmful, or dangerous.
Additionally, we are aware that there may be content on Judy's Book that is personal
in nature or feels invasive. Please note that Judy's Book is a provider of content
creation tools, not a mediator of content. We allow our users express their opinions,
but we don't make any claims about the content of these pages. We strongly believe
in freedom of expression, even if a review contains unappealing or distasteful
content or present negative viewpoints. We realize that this may be frustrating,
and we regret any inconvenience this may cause you. In cases where contact information
for the author is listed on the page, we recommend that you work directly with this
person to have the content in question removed or changed.
Here are some examples of content we will not remove unless provided with a court
order:
Personal attacks or alleged defamation
Political or social commentary
Distasteful imagery or language
If we've read the Terms of Use and believe that this review below violates our Terms
of Use, please complete the following short form.
Businiess name:
All Phase Swimming Pool
|
Review by:
Donna D.
|
Review content:
Dave Graham was to install an above ground pool in the ground along w/a deck & patio. The pool once it was installed, after almost 4 weeks at 2 to 5 hrs. here and there if and when he showed up, was unlevel by over 2 1/2 inches. The deck around the pool was below the coping on one side of the pool and about 5 inches above the coping on the other side of the pool. We had to pull up the composite decking in order to re construct the deck entirely. Upon doing this we discovered why the pool water was unlevel. One of the rails which he installed was bent at the bottom. The pool now has got to be drained out and totally removed in order to properly level and pack the ground under where the pool will rest and the bent rail will need to be replaced. We are not sure if the pool frame will need to be replaced as well for we'll need to hire a real "pool expert" to come and inspect this pool. David Graham did not even as much as have a transit. He was consatntly using our tools as well. He did not even as much as install a retaining wall for we had to do this. He and his so called "crew" of one and sometimes two, had a total disrespect for ones property. All trash was thrown on the ground & under the deck. We had to tell him that was unexceptable and we did not want over 30 empty sand bags, concrete bags, dunkin donuts cups, gatorad bottles and food bags all over the grounds and buried under our "new warped deck". We also found the directions for the pool filter buried under the deck. Davis Graham also wants all the money for the job before the work is even done or completed. Claims he is licensed and insured...yet to be seen.
|
Reasons for reporting (512 characters left):
|
Reasons are required.
|
or
Cancel
|